
Kitchen Remodeling in Los Angeles
SAS Builds remodels kitchens across Greater Los Angeles, from a new layout to a full gut down to the studs. We are a licensed general contractor (California License #1073990), so one team handles the design coordination, permits, trades, and finish work. We walk your kitchen first, then give you a scope, a schedule, and a written price before demolition starts.
- 01Building since 2004California contractor License #1073990, building across Greater Los Angeles since 2004.
- 02Price before demolitionYou approve a written scope, schedule, and price before anything comes out.
- 03Weekly updatesOne crew, weekly photos, and no change without your written yes.

What a kitchen remodel includes
A full kitchen remodel replaces everything you touch: cabinets, counters, appliances, lighting, flooring, and usually the plumbing and electrical behind them. A lighter refresh keeps the layout and swaps the surfaces.
Most of the kitchens we build fall somewhere between the two. The layout gets corrected where it fights you, the systems get brought up to current code, and the finishes are chosen to last. We work out early which of those your kitchen actually needs, because that decision shapes everything after it.

Decisions to make before demolition
The decisions that set your schedule and budget are made before the old kitchen comes out, not during construction. Changing them once walls are open costs time and money.
- Layout: where the sink, range, refrigerator, and island go, and whether any wall moves
- Appliances: exact models, because cabinet sizes, gas lines, circuits, and venting are built around them
- Cabinetry: stock, semi-custom, or fully custom, and the door style and finish
- Stone: the slab itself, ideally chosen in person, plus edge and seam layout
- Lighting: recessed, under-cabinet, and pendants, located on the drawings before rough electrical
What shapes the budget
A kitchen budget is set mostly by how much changes behind the walls and by the level of cabinetry, stone, and appliances you choose. Two kitchens of the same size can land far apart.
- Layout changes: moving a sink, range, or wall changes plumbing, gas, venting, and sometimes structure
- Cabinetry: stock, semi-custom, or fully custom millwork
- Counters and backsplash: stone choice, slab count, and edge and seam detailing
- Appliances and ventilation: a pro range needs real make-up air and a hood sized to match
- Electrical and lighting: dedicated circuits, under-cabinet light, and a panel that can carry the new load
- Condition of the house: older wiring, drain lines, or dry rot found once walls open
How we get you a real number
We price your kitchen after we have seen it, not from a square-foot guess. The first step is a site visit to look at the room, the panel, the plumbing runs, and what is above and below.
From there we write down the scope, set a schedule, and give you a clear written price with an allowance for every finish category. You know what the kitchen will cost and how long it will take before demolition starts.
Start with a walk through your kitchen
Answer a few short questions about your project and book a site visit. We will look at the space and follow up with a scope, schedule, and written price.

How we run a kitchen remodel
Every project follows the same four steps, so you always know what comes next.
- Consult: we walk the space, listen to how you cook and gather, and write down what is in this job
- Plan: drawings, a schedule, and a clear price before anyone starts, with an allowance for every finish category
- Build: one crew, weekly updates and photos, and every change gets a written yes first
- Deliver: a walkthrough, a punch list, and we stand behind the work
Living through a kitchen remodel
Expect to be without a working kitchen for most of the project. Many families set up a temporary station elsewhere in the house with a refrigerator, a microwave, and a sink nearby.
Long-lead items, especially custom cabinets, specialty appliances, and some stone, set the real schedule. Ordering them before demolition, not after, is the single best way to shorten the time your kitchen is out of service.
Protecting the rest of the house
A kitchen remodel should stay in the kitchen. We seal the work area with dust barriers, cover floors along the path in and out, and keep the site clean at the end of each day.
Because the kitchen usually sits at the center of the house, we also plan around how you move through it: which doors stay open, where deliveries come in, and when utilities need to be shut off, so you hear about it ahead of time.
Frequently asked questions
How much does a kitchen remodel cost?
It depends on how much changes. Keeping the sink, range, and walls where they are holds the budget down; moving plumbing, relocating gas, or removing a bearing wall adds significantly, and cabinetry, stone, and appliance level move it further. We give you a written price after a site visit, before any work starts.
Do I need a permit to remodel my kitchen?
Usually, yes. Electrical, plumbing, gas, structural, and window changes all require permits in Los Angeles jurisdictions. Replacing surfaces alone, such as paint or flooring, generally does not. We pull the permits and schedule the inspections with the building department that covers your address.
Can I keep my layout to save money?
Yes. Keeping the sink, range, and refrigerator where they are is one of the most effective ways to control a kitchen budget, because it avoids moving plumbing, gas, and venting. Money saved there can go into cabinetry, stone, and lighting, which you see every day.
How long will I be without a kitchen?
It depends on scope and on long-lead items like custom cabinets and specialty appliances. We order those before demolition so the kitchen is out of service for as short a time as possible, and we give you a schedule in writing before work starts.
Is SAS Builds licensed?
Yes. SAS Builds holds California contractor License #1073990, issued by the Contractors State License Board. You can verify it for free at cslb.ca.gov.
Planning guides
- Materials GuideA Guide to Home Finish MaterialsWhat each finish actually is, where it belongs, and what it asks of you later.
- GuideWhat to Expect During ConstructionA month-by-month picture of life while your project is underway.
- GuideHow Long Does It Take to Build a Custom Home?Realistic timelines for custom homes, remodels, and additions.



