ADU Builder in Los Angeles

An accessory dwelling unit (ADU) adds a full, separate living space to your property: a backyard cottage, a converted garage, or a unit attached to the house. In Greater Los Angeles an ADU or garage conversion typically takes about 5 to 10 months to build. SAS Builds handles the design coordination, permits, and construction.

License #1073990Since 2004(818) 624-8200
Detached backyard structure under construction, wrapped and ready for finishes
  • Licensed contractorCalifornia License #1073990, building in Greater Los Angeles since 2004.
  • Permits handledWe take the plans through LADBS or your local building department.
  • Utilities planned earlySewer, power, and water runs checked on the first site visit.

Types of ADUs

California recognizes a few kinds of ADU. The right one depends on your lot, your budget, and how you plan to use the space.

  • Detached ADU: a stand-alone unit in the backyard
  • Attached ADU: new space added to the main house with its own entrance
  • Garage conversion: an existing garage turned into a living unit
  • Junior ADU (JADU): a smaller unit carved out of space inside the existing house

Garage conversions: what to check first

A garage is a head start, not a finished shell. Garages were built to park cars, so the slab, walls, and roof were not built for people to live in.

  • Whether the slab is sound and can take a vapor barrier and new flooring
  • Whether the walls and roof can be insulated to code
  • Ceiling height, and whether the framing can carry new loads
  • How far the garage is from the sewer line and the electrical panel
  • Where windows and an entry door can go to meet code for light and egress

Designing a small space that lives large

In a small unit, every decision shows. Light, storage, and how the kitchen and bath fit together matter more than square footage.

Decide early who the ADU is for: a family member, a home office, or a rental. That sets how full the kitchen needs to be, whether the unit needs its own laundry, and how much privacy it needs from the main house. Higher ceilings, larger windows, and built-in storage make a small floor plan feel open.

Farmhouse sink with a brass faucet, marble counters, and a pot filler over the range

What shapes the budget

The biggest driver is whether you are converting an existing structure or building new. A new detached unit needs its own foundation, roof, and utility connections. A conversion reuses some of that, depending on its condition.

Utility runs are the cost people miss most. A new sewer line, a separate electrical service, or a long trench across the yard changes the scope. Access matters too: a backyard reached only through a narrow side yard takes longer to build in. Then there are finishes, which you control.

We look at all of this on the first site visit. Then we write down the scope and schedule and give you a clear written price before work starts.

Posts and bracing going up on a new concrete patio slab

California ADU rules, in plain language

State law makes ADUs easier to permit than most other projects. Cities must review a complete ADU application ministerially, which means against set standards rather than at a hearing. Local rules still apply, so details vary by address. These are the general state rules:

  • Detached ADUs are commonly allowed up to 1,200 square feet
  • A junior ADU can be up to 500 square feet, inside the existing home
  • Side and rear setbacks for an ADU are generally 4 feet
  • Impact fees are generally waived for ADUs under 750 square feet
  • Parking is generally not required near public transit, and a converted garage generally does not have to be replaced

Permits in the City of Los Angeles

Inside the City of Los Angeles, ADU permits go through the Department of Building and Safety (LADBS). The city has also offered a standard plan program with pre-reviewed ADU designs, which can shorten plan check. Check the current program with LADBS, since the rules and options change.

Hillside lots, fire hazard zones, and the Coastal Zone add review steps. Outside the city, Los Angeles County and neighboring cities each have their own ADU rules within the state framework.

How long it takes

Construction on an ADU or garage conversion typically takes 5 to 10 months. Design and permitting come first. A conversion with a simple layout moves fastest. A new two-story detached unit on a sloped lot takes the longest.

Because the work happens in your backyard, we plan the path the crew and materials take through the property, keep the main house’s utilities running, and give you weekly updates and photos as the unit comes together.

Shower walls and bench waterproofed before tile

Frequently asked questions

What affects the cost of an ADU?

Whether it is a conversion or new construction, the size, the utility runs to the unit, site access, and your finishes. Conversions reuse an existing structure; new detached units need their own foundation, roof, and connections. We give you a written price after a site visit.

How big can an ADU be in California?

State law commonly allows a detached ADU up to 1,200 square feet and a junior ADU up to 500 square feet inside the existing home. Local rules for height, setbacks, and lot coverage still apply, so the size you can build depends on your address.

Is a garage conversion simpler than a new ADU?

Usually yes, because the foundation, walls, and roof already exist. Older garages sometimes need a new slab, added insulation, or structural upgrades to meet code for living space, so an inspection early on is worth it.

How long does it take to build an ADU?

Construction typically takes 5 to 10 months. Design and permitting add time before that. Conversions with simple layouts move fastest, while new detached units on sloped lots take the longest.

Do I need to provide parking for an ADU?

Often not. California generally waives ADU parking requirements near public transit, and a garage converted to an ADU generally does not have to be replaced. Check the rules for your specific address with your local building department.