General Contractor in Sherman Oaks

SAS Builds is a licensed general contractor (California License #1073990) taking on remodels, additions, and custom homes in Sherman Oaks. Whether your house is in the hills south of Ventura Boulevard or on the valley floor, we handle the permits, the trades, and the schedule, and we give you a clear price before anyone starts.

Or call (818) 624-8200
Living room with exposed wood ceiling beams and a plaster fireplace wall
  • Valley and hillsideWe check hillside and zoning rules for your address before design starts.
  • One accountable teamOne crew and one point of contact from first visit to final walkthrough.
  • Price before workA written scope, schedule, and price before anyone starts.

What we build in Sherman Oaks

We take on the full range of residential work.

  • Kitchen and primary bath remodels
  • Whole-home renovations, interior and exterior
  • Room additions and second-story additions
  • Outdoor living: kitchens, patios, and yards
  • New custom homes on teardown lots
White shaker kitchen with a professional range, plaster hood, and quartzite counters

Hillside lots and the valley floor

Sherman Oaks is really two places to build. The hills south of Ventura Boulevard bring slopes, narrow streets, and tighter rules. The flatter streets to the north are simpler to build on but have their own zoning limits.

Many hillside lots in the City of Los Angeles fall under the Baseline Hillside Ordinance, which generally limits floor area and grading more tightly than flat lots. Some hillside areas are also in fire hazard zones. We check what applies to your address before design starts, so the plans fit what the city will approve.

Adding space to a valley home

Many Sherman Oaks homes were built decades ago and are smaller than today’s families need. A ground-floor addition or a second story can add a primary suite, a family room, or a larger kitchen without leaving the neighborhood.

A single-room addition usually takes 4 to 7 months to build once permits are issued. A second story needs a structural engineer to confirm the existing house can carry it before design goes far.

Primary bath with twin oak vanities, sconces, and marble-look tile

What we find in older valley homes

Opening the walls of an older house usually turns up work that was not visible on day one. Planning for it keeps the job on track.

  • Electrical panels too small for a modern kitchen, EV charger, or added air conditioning
  • Older galvanized or cast-iron plumbing near the end of its life
  • Little or no insulation in walls and attics
  • Framing that needs new shear walls or connections when walls move
  • Ductwork sized for a smaller house
Next step

Start your Sherman Oaks project

Answer a few short questions about your home and goals, and we will book a call and a site visit.

Or call (818) 624-8200

Built for valley summers

Valley summers are hot, and the way a house handles heat shapes how much of it you use. Shade, insulation, and air conditioning sized for the new layout belong in the plan from the start.

Outside, a covered patio or pergola, an outdoor kitchen, and a yard planned around shade turn the backyard into usable space for more of the year. Inside, better windows and insulation make larger open rooms comfortable.

Steel and wood pergola over a new concrete patio with lawn

What shapes the budget

The budget follows the scope: how much of the house changes, whether walls or rooflines move, and whether systems like the panel, plumbing, or HVAC need upgrading. Hillside lots add engineering, access, and sometimes retaining walls.

Finish level is the part you control most. Cabinetry, stone, tile, and fixtures range widely, and we help you choose where to spend and where to save. After the site visit we write down the scope and schedule and give you a clear written price before work starts.

Permits in Sherman Oaks

Sherman Oaks is part of the City of Los Angeles, so permits go through the Department of Building and Safety (LADBS). Plan check typically takes 3 to 9 months, and longer for hillside projects.

How we work

We walk the site, write down what is in the job, and give you drawings, a schedule, and a clear price before anyone starts. During construction you get one crew, weekly updates and photos, and a written yes before any change. At the end there is a walkthrough and a punch list, and we stand behind the work.

Frequently asked questions

Do you work in Sherman Oaks?

Yes. SAS Builds takes on remodels, additions, and custom homes in Sherman Oaks and across the San Fernando Valley. We are a licensed California general contractor (License #1073990) and have built in Greater Los Angeles since 2004.

Who issues building permits in Sherman Oaks?

Sherman Oaks is part of the City of Los Angeles, so building permits come from the Department of Building and Safety (LADBS). Hillside lots may face additional limits under the Baseline Hillside Ordinance.

What affects the cost of an addition in Sherman Oaks?

The size of the addition, how it ties into the existing house, upgrades the existing systems need, the site, and your finishes. Hillside lots and structural work add the most. We give you a written price after walking the property, before any work starts.

How long does a kitchen remodel take?

A permitted kitchen remodel usually takes 8 to 14 weeks of construction, plus design and permitting beforehand. Moving plumbing or gas, or removing a bearing wall, extends the timeline.