What we build in Calabasas and Hidden Hills
We take on large residential projects here, from full renovations to new homes.
- Full-home renovations, interior and exterior
- Primary suites, baths, and home offices
- Additions and guest houses
- Outdoor living: kitchens, patios, and yards
- New custom homes

Our Hidden Hills project
Our Hidden Hills project was a full renovation, including the primary bathroom and a home office. You can see the finished rooms in the project gallery below.

Three different permit paths
Calabasas is its own city with its own Building and Safety department. Hidden Hills is a separate, gated city with its own permitting, and the community has its own architectural review. Some nearby addresses with a Calabasas mailing address are actually in unincorporated Los Angeles County, which means County permits.
Knowing which applies to your address is the first step. We confirm it before design starts, so the plans go to the right agency and meet the right standards.
Planning for design review
In a community with architectural review, exterior changes are approved before city permits move forward. Treating that review as its own phase keeps it from surprising the schedule.
Exterior materials, colors, rooflines, and the height and placement of new structures are what review usually looks at. We prepare the drawings and material selections that review needs, and we keep interior work that does not depend on it moving where we can.
Fire zones and hillside lots
Much of the hillside land around Calabasas is in a fire hazard severity zone. New construction and major remodels there generally have to meet California’s wildland-urban interface standards: Class A roofing, ember-resistant vents, ignition-resistant exterior materials, and tempered multi-pane windows.
Sloped lots can also need soils reports, retaining walls, and grading review. We plan for those from the first site visit.
Decisions to make early on a large renovation
On a whole-home renovation, a few early decisions shape everything after them. Making them before plans are final avoids rework and change orders.
- Which walls move, and whether any of them carry load
- Where the primary suite and home office go, and how they are separated from the rest of the house
- Whether to upgrade the electrical service, HVAC, and plumbing while walls are open
- Long-lead items like windows, cabinetry, and stone, so they are ordered in time
- Whether you will live elsewhere during construction, which changes how the work is phased

What shapes the budget
On large homes here, scope and finish level drive the budget most. How much of the house is opened up, whether the layout changes, and the systems that need replacing set the base. Cabinetry, stone, glass, and fixtures are where the range is widest.
Hillside work, fire-zone materials, and the time design review adds also belong in the budget. We walk the property, confirm which agency and review apply, and then give you the scope, schedule, and a clear written price before work starts.
How we work
We walk the site, write down what is in the job, and give you drawings, a schedule, and a clear price before anyone starts. During construction you get one crew, weekly updates and photos, and a written yes before any change. At the end there is a walkthrough and a punch list, and we stand behind the work.
Frequently asked questions
Do you work in Calabasas and Hidden Hills?
Yes. SAS Builds has completed a full renovation in Hidden Hills and takes on custom homes, renovations, and additions across Calabasas and the surrounding area. We are a licensed California general contractor (License #1073990).
Who issues building permits in Calabasas?
The City of Calabasas has its own Building and Safety department. Hidden Hills is a separate city with its own permitting and community architectural review. Some addresses with a Calabasas mailing address are in unincorporated Los Angeles County and use County permits.
Does Hidden Hills have design review?
Yes. Hidden Hills is a gated community, and exterior changes generally go through the community’s architectural review in addition to city permits. We plan the schedule around that review.
How long does a whole-home renovation take?
A whole-home gut renovation typically takes 9 to 16 months of construction, plus design and permitting beforehand. Design review in gated communities and hillside requirements can add time to the early phases.





